{"id":10351,"date":"2026-08-07T21:23:07","date_gmt":"2026-08-07T21:23:07","guid":{"rendered":"https:\/\/safwaa.com\/uncategorized\/the-successful-project-begins-before-construction\/"},"modified":"2026-08-07T21:56:52","modified_gmt":"2026-08-07T21:56:52","slug":"the-successful-project-begins-before-construction","status":"publish","type":"post","link":"https:\/\/safwaa.com\/en\/expert-tips\/the-successful-project-begins-before-construction\/","title":{"rendered":"The Successful Project Begins Before Construction"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\" style=\"font-size:24px\"><strong>The right decisions are made <strong>before the first stone is laid<\/strong>.<\/strong><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">In any <a href=\"https:\/\/safwaa.com\/%D9%85%D8%B4%D8%B1%D9%88%D8%B9\/\">project<\/a>, the moment construction begins may seem like the most important moment.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Work starts on site, construction teams begin their work, equipment arrives, and the project gradually begins to take shape.   <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">But the reality is that a significant part of the project&#8217;s success has already been determined before all of this.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>Before excavation begins.<\/strong><br\/><strong>Before equipment is selected.<\/strong><br\/><strong>And before the first stone is laid.<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\" style=\"font-size:24px\">Because what happens on site is often the result of decisions that were made much earlier.<\/p>\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:40px;margin-bottom:40px;background-color:#d1dae636;color:#d1dae636\"\/>\n\n<h2 class=\"wp-block-heading has-ast-global-color-0-color has-text-color has-link-color wp-elements-d2f1c49a93465b99900b81fbbe2ee258\" style=\"padding-top:25px;padding-bottom:25px;font-size:26px\"><strong><strong>The Beginning Is Not Always at the Project Site<br\/><\/strong><\/strong><\/h2>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:10px\">When looking at a <a href=\"#\">swimming pool<\/a>, <a href=\"\/?project_category=&#x627;&#x644;&#x646;&#x648;&#x627;&#x641;&#x64A;&#x631;-&#x627;&#x644;&#x634;&#x644;&#x627;&#x644;&#x627;&#x62A;\">fountain, waterfall<\/a>, or <a href=\"\/?project_category=&#x63A;&#x631;&#x641;-&#x627;&#x644;&#x628;&#x62E;&#x627;&#x631;-&#x648;&#x627;&#x644;&#x633;&#x627;&#x648;&#x646;&#x627;\">steam room project<\/a>, it is natural to focus on the final result.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">The design.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">The materials.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">The architectural details.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">And how the project will look once completed.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">But behind that final image is a long series of decisions that may not be immediately visible to the client.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">How will the project be used?<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Who will use it?<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">What are the characteristics of the site?<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Which systems are suitable for it?<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">How will future maintenance be carried out?<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Where should the equipment be located?<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">How will the systems interact with the architectural and structural elements?<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">And what could happen if one of these elements changes during construction?<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">These questions are not secondary details.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>They are part of the design itself.<\/strong><\/p>\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:40px;margin-bottom:40px;background-color:#d1dae636;color:#d1dae636\"\/>\n\n<h2 class=\"wp-block-heading has-ast-global-color-0-color has-text-color has-link-color wp-elements-c3a4135aa633581b88d256cef9d19c3c\" style=\"padding-top:25px;padding-bottom:25px;font-size:26px\"><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong>The Right Decision at the Beginning Saves a Lot Later<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">One of the most common mistakes in <a href=\"https:\/\/safwaa.com\/%D9%85%D8%B4%D8%B1%D9%88%D8%B9\/\">projects <\/a>is treating early decisions as matters that can easily be changed at any time.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">But every decision becomes more difficult and costly the later it is made.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">Choosing the equipment room location after structural work has been completed is not the same as determining it from the beginning.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">Modifying plumbing routes after finishes have been installed is not the same as coordinating them before construction.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">Adding a control system or new equipment after the project is completed is not the same as preparing the required infrastructure during the design stage.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">That is why good planning is not only about knowing <strong>what will be built<\/strong>&#8230;<br\/> <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">It is also about knowing:<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\"><strong>When should each decision be made?<\/strong><\/p>\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:40px;margin-bottom:40px;background-color:#d1dae636;color:#d1dae636\"\/>\n\n<h2 class=\"wp-block-heading has-ast-global-color-0-color has-text-color has-link-color wp-elements-03ede3534f30ce106a2ff69a21aa5e76\" style=\"padding-top:25px;padding-bottom:25px;font-size:26px\"><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong>A Project Is Not a Collection of Separate Tasks<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">In specialized projects, individual elements do not work independently.<br\/> <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">The swimming pool is connected to the hydraulic systems.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">The systems are connected to the equipment room.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">The equipment room is connected to the site&#8217;s layout and service routes.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">Lighting is connected to the architectural design.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">And the finishes must be compatible with the intended use and environmental conditions.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">Ultimately, all of these elements must work together as one integrated system.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">That is why project success does not depend only on the quality of each individual element. <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">It also depends on<strong> how well those elements work together<\/strong>.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">The equipment may be excellent, the design may be beautiful, and the execution may be precise&#8230;<br\/>  <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\" style=\"padding-top:10px;padding-bottom:0px\">But if these elements were not coordinated from the beginning, problems may appear that could have easily been avoided during the planning stage. <\/p>\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:40px;margin-bottom:40px;background-color:#d1dae636;color:#d1dae636\"\/>\n\n<h2 class=\"wp-block-heading has-ast-global-color-0-color has-text-color has-link-color wp-elements-3f07dd90e100e176992762be6ff65498\" style=\"padding-top:25px;padding-bottom:25px;font-size:26px\"><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong>What You Don&#8217;t See Today May Affect the Project for Years<br\/> <\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">There are many parts of a water project that do not appear in the final image.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Water lines.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Waterproofing.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Pumps.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Filtration systems.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Control systems.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Electrical systems.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Equipment rooms.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">And access routes for maintenance and servicing.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Users may never notice these elements while enjoying the pool or fountain.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">And that is actually a good sign.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Because the best systems perform efficiently without imposing their presence on the experience.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">But achieving that result requires thinking about them <strong>before construction, not after it. <\/strong><strong>.<\/strong><\/p>\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:40px;margin-bottom:40px;background-color:#d1dae636;color:#d1dae636\"\/>\n\n<h2 class=\"wp-block-heading has-ast-global-color-0-color has-text-color has-link-color wp-elements-bc0cc1fefd001306649f77d48953478c\" style=\"padding-top:25px;padding-bottom:25px;font-size:26px\"><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong>What Happens When a Decision Is Made Too Late?<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">When an important decision is made late, its impact is rarely limited to one element.<br\/> <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">It may require a design modification.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Or rework.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Or changes to service routes.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Or more expensive equipment.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Or make future maintenance more difficult.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Sometimes, the final available solution may even be less efficient than the solution that could have been implemented if the issue had been considered from the beginning. <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">And this is where the difference becomes clear between:<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>Building a project&#8230; <strong>and<\/strong><\/strong><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\"> <strong>managing a project from an integrated engineering perspective.<\/strong><\/p>\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:40px;margin-bottom:40px;background-color:#d1dae636;color:#d1dae636\"\/>\n\n<h2 class=\"wp-block-heading has-ast-global-color-0-color has-text-color has-link-color wp-elements-505fa4dbc7775c2b9a3db20d2ebba602\" style=\"padding-top:25px;padding-bottom:25px;font-size:26px\"><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong>Good Planning Does Not Mean Planning for Perfection<\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">No project is completely free from changes.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Unexpected conditions may arise during construction.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">But the purpose of planning is not to prevent every possible change.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">It is to make the project <strong>better prepared to deal with them<\/strong>.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">When systems are properly studied, options are clearly defined, and coordination between disciplines begins early, changes become easier to manage and are less likely to develop into larger problems.<br\/>    <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Good planning does not mean that everything will happen exactly as originally drawn.<br\/> <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">It means that the project has a strong foundation that allows it to respond to reality.<\/p>\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:40px;margin-bottom:40px;background-color:#d1dae636;color:#d1dae636\"\/>\n\n<h2 class=\"wp-block-heading has-ast-global-color-0-color has-text-color has-link-color wp-elements-f829fc79f4816bd67017206217f19ca7\" style=\"padding-top:25px;padding-bottom:25px;font-size:26px\"><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong>Before You Ask: How Much Will the Project Cost?<br\/> <\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">There is another question worth asking first:<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>What does the project actually need?<\/strong><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Because cost is not simply the price of equipment, materials, or construction work.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">The true cost is also related to the system&#8217;s lifespan, operating efficiency, ease of maintenance, accessibility of equipment, and the likelihood of requiring modifications in the future.<br\/>    <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">A particular option may appear less expensive initially&#8230;<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">But if it results in higher operating costs, more complicated maintenance, or repeated modifications, it may not be the most economical choice in the long run. <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">That is why a good engineering decision does not always look for<strong> the lowest cost<\/strong>. <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">It looks for the <strong>best value for the investment<\/strong>.<\/p>\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:40px;margin-bottom:40px;background-color:#d1dae636;color:#d1dae636\"\/>\n\n<h2 class=\"wp-block-heading has-ast-global-color-0-color has-text-color has-link-color wp-elements-11e0fbd126992702615799fa9c835744\" style=\"padding-top:25px;padding-bottom:25px;font-size:26px\"><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong><strong>This Is Where the Real Project Begins<br\/><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Before construction starts, there is another stage that is just as important. <\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">The stage of thinking.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Studying the site.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Understanding how the project will be used.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Defining the requirements.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Selecting the right solutions.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Coordinating the different systems.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">And anticipating the project&#8217;s needs not only when it opens&#8230;<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">But years after it begins operating.<\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Because a good project is not measured only by how it looks on opening day.<br\/><\/p>\n\n<p class=\"has-medium-font-size wp-block-paragraph\">It is measured by its ability to continue delivering the performance, efficiency, and experience it was designed to provide.<\/p>\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:40px;margin-bottom:40px;background-color:#d1dae636;color:#d1dae636\"\/>\n\n<h2 class=\"wp-block-heading has-ast-global-color-0-color has-text-color has-link-color wp-elements-8987b6c6d23225e94111cb1555ee34d0\" style=\"font-size:24px\">Conclusion<\/h2>\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\" style=\"padding-top:0px;padding-bottom:0px;font-size:22px\"><strong>At Safwaa Pools&#8230;<br\/> <\/strong><\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">We do not see the planning stage as simply a step that comes before construction.<br\/><\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">We see it as an essential part of creating the project itself.<br\/><\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Every detail considered early, every system carefully selected, and every decision coordinated with the rest of the project&#8230;  <\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Contributes to a result that is more efficient, more reliable, and better prepared to perform over time.  <\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\"><strong>Because a successful project does not begin when the construction team arrives on site&#8230;<\/strong><br\/><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"padding-top:0px;padding-bottom:0px;font-size:22px\"><strong>It begins when the right decisions are made long before that.<\/strong><br\/><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"font-size:22px\"><a href=\"https:\/\/safwaa.com\/en\/\">Safwaa Pools<\/a><br\/><strong>We Design Experiences&#8230; <strong>Not Just Pools.<\/strong><\/strong><\/p>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>A successful project does not begin when construction starts. It begins with the decisions made beforehand. Discover how planning, site assessment, system selection, and engineering coordination can improve project efficiency, reliability, and long-term performance.    <\/p>\n","protected":false},"author":1,"featured_media":10350,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"disabled","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[83],"tags":[241,244,240,123,199,195,243,131],"class_list":["post-10351","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-expert-tips","tag-241","tag-244","tag-240","tag-123","tag-199","tag-195","tag-243","tag-131"],"acf":[],"_links":{"self":[{"href":"https:\/\/safwaa.com\/en\/wp-json\/wp\/v2\/posts\/10351","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/safwaa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/safwaa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/safwaa.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/safwaa.com\/en\/wp-json\/wp\/v2\/comments?post=10351"}],"version-history":[{"count":2,"href":"https:\/\/safwaa.com\/en\/wp-json\/wp\/v2\/posts\/10351\/revisions"}],"predecessor-version":[{"id":10354,"href":"https:\/\/safwaa.com\/en\/wp-json\/wp\/v2\/posts\/10351\/revisions\/10354"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/safwaa.com\/en\/wp-json\/wp\/v2\/media\/10350"}],"wp:attachment":[{"href":"https:\/\/safwaa.com\/en\/wp-json\/wp\/v2\/media?parent=10351"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/safwaa.com\/en\/wp-json\/wp\/v2\/categories?post=10351"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/safwaa.com\/en\/wp-json\/wp\/v2\/tags?post=10351"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}